Formwork

Form Tie

FORMTIE B
Both sides exposed
FORMTIE C
Both sides finished
FORMTIE BC
One side finished and 
other side exposed
FORMTIE D
Both sides exposed
FORMTIE Dimensional Diagrams
Type L m/m 1 m/m Remarks
FORMTIE C (Common to B, C and BC)
310 145 ø1 = W5/16
           W3/8
ø2 = W1/2
with a nut
250 145
210 120
180 95
150 95
FORMTIE D
L m/m 1 m/m 1 m/m ø = W1/2
with a nut
360 120 80
300 120 80
250 120 80
INNER UNIT Specification
Type Dimensional Diagrams Use
Inner Unit B Both sides exposed.
W5/16W3/8
Inner Unit C Both sides finished.
W5/16W3/8
Inner Unit BC One side finished and other side exposed.
W5/16W3/8
Inner Unit D Both sides exposed.
W1/2

Hardware for FORM TIE

FORMTIE Dimensional Diagrams

The Form Tie has been adopted widely in concrete construction to maintain accurate from spacing and ensures the dimensional accuracy of concrete structure. Construction cost had been kept down due to the simplicity of the method.

  For Wood Batters   For Round Pipe Batters

Flat Rib Washer (200X55)

Flat Rib Washer (150X50)

Flat Rib Washer (105X50)

3-shape Rib Washer D

3-shape Rib Washer
Formwork Clamps
Yellow Clip Clamp

The safest locking system for your formwork with the economical use of rebar

Self-locking Clamp
  • It utilizes the rebar
  • It can be applied and removed in a moment
  • It does not rust or need maintence
  • Greater formwork pressure, bigger clamping with clip
Rapid Clamp

Greater formwork pressure, bigger clamping with clip.

Double Locking plus around 40% time saving for fitting and removing.